Gas Turbine Test Rig by Edutek Instrumentation

Gas Turbine Test Rig  EDE-211The Gas Turbine test rig will have at least the following units Turbocharger Assembly: Composed of centrifugal compressor (in light alloy) and turbine (in cast iron)..

Categories: ,

Product Description

Gas Turbine Test Rig  EDE-211

The Gas Turbine test rig will have at least the following units
  • Turbocharger Assembly: Composed of centrifugal compressor (in light alloy) and turbine (in cast iron) with the following features: operating at maximum compression ratio of about 2 : 1. operating at a speed of approx. 30,000 to 50,000 r.p.m
  • Combustion Chamber : Shall consist of an external chamber and a flame tube mounted inside it. The combustion chamber will have such designed that there is even distribution of heat and there are no over heating points. The turbine which starts compressor will be a centrifugal machine with 75mm dia.
  • Power Turbine Group: The Rotor assembly of the turbine will be perfectly balanced and will have arrangement for continuous lubrication. The larger turbine will attain a maximum speed of 2,000 to 23,000 r.p.m and the turbine power will be transmitted to the alternator by the means of toothed belt having transmission ration of 1 : 4.28 producing approx. 1.KW at 3,300 rpm.
  • Fuel System: The Turbine will be able to work on Propane or L.P.G.

The following will also be provided with the Gas Turbine set up
  • 'U' shaped manometer to measure turbine air consumption.
  • Air filter
  • Techno meters to measure the speed of turbo compressor unit, rotating speed of power turbine.
  • Gas flow rate regulation valve and Gas flow meter to measure gas flow rate measurement.
  • Spark plug
  • Auxiliary Starting fan
  • Oil tank 20ltr capacity
  • Water/oil heat exchanger
  • Digital ammeter and voltmeter
  • 2 Nos digital temperature indicators with 3 reading each, 6 nos pressure gauges.
  • Complete digital electronic instrumentation for control and measurement of power absorbed by the alternator.
  • Gas exhaust duct, wheeled frame with mimic diagram panel
Apart from the above, system will have control devices for control and operation of fan, pump, gas pressure, gas flow, turbine braking etc.

The system will have the following also
  • Oil cooler system
  • Oil pump
  • Oil heat exchanger
  • Starting fan
  • Gas exhaust
  • Oil filter

Major Parameter

  • Gas Generation Turbine R.P.M: Working range 30000 to 50000
  • Power Turbine R.P.M: Operating range 2000 to 23000
  • Generator R.P.M: Operating range 330 to 3300
  • Alternator Power Output (Max. at 3300 rpm): 1.0 K.W.
  • The system will be supplied with automatic safety device to prevent over speeding.
  • The unit will have an automatic closed circuit pressurized lubrication system along with tube nest oil cooler for cooling the oil.
  • The unit will have at least the following safety measures
    • Luminous Intermitants signals, near the critical temperature.
    • Automatic / Manual regulation of cooling water.
    • Luminous signal for gas solenoid valve operation.
  • The gas turbine should be capable of conducting the following experiments
    • Study of a Joule-Brayton cycle
    • Study on a reduced scale of a plant for the production of electrical energy by a gas turbine
    • Study of the starting procedure of a gas turbine
    • Measurement of the air flow input as a function of the speed of the turbocharger
    • Pressure and temperature in the combustion chamber as a function of the speed of the turbocharger
    • Calculation of the specific consumption as a function of the speed of the turbocharger
    • Calculation of the output power as a function of the speed of the power turbine
    • Determination of the power output with different input parameters.
    • Safety systems in the operation of a gas turbine.

Power supply: 440 V + 10%, 3 phase A.C.

Product Specification

Similar Products

New
Hydraulically Operated Diaphragm pumps
Soorya Hi-tech Pumps from Coimbatore

Since the incorporation of our organization, we are offering Hydraulically Operated Diaphragm Pump t.

25000.00 24500

per Unit(s)

New
Book Cases
Rawat Brothers Furniture Pvt. Ltd. from Pune

Riding on immense volumes of industrial expertise, we have come up with a wide consignment of Book C.

New
Jute Carry Bag
Ayesha Enterprises from Mumbai

We are one of the reliable companies in this domain and are offering Jute Carry Bag.Price Range:- Rs.

50.00 49

per Piece

New
End Suction Monoblock Pumps
Pankaj Traders from Kanpur

Owing to our affluent industry acquaintance, we present End Suction Monoblock Pumps..

5600.00 5488

per Piece

New
Kirloskar Electric Pump
Shyam & Co. from Nagothane

This Kirloskar Electric Pump is a sub-class of dynamic axisymmetric work-absorbing turbo machinery.F.

New
Chemical Oil Steam And Power Generator Pump
KSB Pumps Limited from Pune

  Horizontal, single stage, end suction, radially split volute casing pump in backpull- out .

New
Bevel Gear Shaft
Universal Engineers from Ahmedabad

Bevel Gears Shafts are gears & shafts where the axes of the two shafts intersect and the tooth-beari.

New
Electric Motor Operated Centrifugal Barrel Pump, 3/4 Inch (Discharge) X 44 Mm Suction
Perfect Engineers from Ahmedabad

These are electric motor (Non FLP / FLP ) operated barrel pumps with suction pipe kit used for barre.

30000.00 29400

per Piece

New
TEXMO JET PUMPS
BR Traders from Manapparai

AQUAGROUP’S “TEXMO” Jet Monoblocks are capable of pumping water from bore wells an.

New
Kirloskar Pumps
Gen Powers from Patiala

Kirloskar Pumpsets for Domestic, Industrial, Dewatering & Fire Fighting Application. The pumpset.

Submit your review